We recommend that you get an Expobar professional engineer to install your machine. Prior to installation all customers are required to complete an pre installation questionnaire which is designed to ensure you have all the services in place prior to the installation date.
Pre-install check list
- Electrical supply within 1 metre.
- 15 mm Dedicated cold water supply within 1 metre with 3/4” washer tap.
- 35mm Trapped Waste Under work top within 1 metre
- Work top area complete and with space for machine
- Space for grinder with 13A socket
- Work top capable of supporting weight
- Has hole been made through work top for pipes/cables.
- Preferred work surface height 900mm (only for optimum working)
- Assistance to lift the machine.
- Space for water filter under work top
- The electrical and water supplies are working?
- Is there coffee and cups on site so the engineer can commission the machine?